Production scheduling

Feasible, optimized schedules that match capacity to demand.

What it is

Sequences in Linkube are built against actual line rates, shift calendars, setup matrices and component availability, and stay current as orders and breakdowns land. A schedule that ignores changeover times or material arrival dates fails on the shop floor within hours; one built on the real constraints holds. Schedulers spend their time deciding between alternatives instead of rebuilding the board.

What you get

  • Sequences that respect setups, shifts and materials
  • Fewer changeovers through grouping by setup family
  • Fast rescheduling when a line or order changes
  • Due-date performance visible before release

How it works

  1. 01

    Load orders, routings, line rates and shift calendars

  2. 02

    Sequence to minimize changeovers while protecting due dates

  3. 03

    Release the schedule to the floor and monitor execution against it